1 |
Ropeway Project between Sonprayag and Kedarnath on Design, Build, Finance, Operate and Transfer (DBFOT) model |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
2 |
Considering the revalidation of the revised cost of the Development, Maintenance and Management of the New NH-06 from Existing 61.8KM, Mawlyngkhung (Barapani Near Shillong in Meghalaya) to existing Km.197.40 New NH-06 (Panchgram in Assam) in the State of Meghalaya and Assam by 4-Laning with paved Shoulder on Hybrid Annuity Mode (HAM) Basis under Public-Private Partnership (PPP) Mode reg: - |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
22,863.93 |
21.02.2025
|
121st PPPAC
|
Final approval |
3 |
Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Tamil Nadu |
Transport and Logistics |
Roads |
32.09 |
04.02.2025
|
120th PPPAC
|
Final approval |
4 |
Six-lane Access Control Greenfield Capital Region Ring Road (Bhubaneswar Bypass) from Rameshwar to Tangi in the State of Odisha on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Odisha |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
5 |
Two-lane with Paved shoulder from Basnaghat (Morigaon) to Bhuragaon (in Darrang district) including new 2 lane Major Bridge over river Brahmaputra in the State of Assam on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
0.00 |
04.02.2025
|
120th PPPAC
|
Final approval |
6 |
Four-lane, Badvel to Nellore section of NH-67 in the state of Andhra Pradesh on HAM |
Ministry of Road Transport and Highways (MoRTH) |
Andhra Pradesh |
Transport and Logistics |
Roads |
4,377.38 |
04.02.2025
|
120th PPPAC
|
Final approval |
7 |
Four-lane STRR, NH948A - Obalapura to S.Mudugadapalli in Karnataka & Tamil Nadu on HAM. |
Ministry of Road Transport and Highways (MoRTH) |
Karnataka |
Transport and Logistics |
Roads |
8,834.08 |
01.01.2025
|
119th PPPAC
|
Final approval |
8 |
Six-lane Zirakpur Bypass in the state of Punjab & Haryana on Hybrid Annuity Mode |
Ministry of Road Transport and Highways (MoRTH) |
Punjab |
Transport and Logistics |
Roads |
1,878.31 |
01.01.2025
|
119th PPPAC
|
Final approval |
9 |
Ropeway project between Govindghat and Hemkund Sahib in the State of Uttarakhand on DBFOT model. |
Ministry of Road Transport and Highways (MoRTH) |
Uttarakhand |
Transport and Logistics |
Roads |
2,589.04 |
01.01.2025
|
119th PPPAC
|
Final approval |
10 |
Four-Lane Patna – Arrah - Sasaram Access Controlled Greenfield Corridor’ as a new National Highway NH-119A on Hybrid Annuity Model (HAM) |
Ministry of Road Transport and Highways (MoRTH) |
Bihar |
Transport and Logistics |
Roads |
0.00 |
03.12.2024
|
118th PPPAC
|
Final approval |
11 |
Six-Lane Greenfield Highway from Pagote to Chowk of NH 348B in Maharashtra on Built Operate Transfer (BOT) mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
3,653.09 |
03.12.2024
|
118th PPPAC
|
Final approval |
12 |
Greenfield Development, Maintenance and Management of a new alignment of National Highway-06 from Mawlyngkhung in Meghalaya (from 61.8 km on existing NH06) to Panchgram in Assam (to 197.4 km on the existing NH06) by 4 laning with paved shoulders. |
Ministry of Road Transport and Highways (MoRTH) |
Meghalaya |
Transport and Logistics |
Roads |
24,804.82 |
09.11.2024
|
117th PPPAC
|
Final approval |
13 |
Construction of Six lane access-controlled Greenfield Expressway from Km 0.000 to Km 213.803 (Tharad to Ahmedabad-Design length 213.803 km) in 6 packages under Bharatmala Pariyojana in the State of Gujarat on Hybrid Annuity Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Gujarat |
Transport and Logistics |
Roads |
10,578.97 |
02.03.2024
|
115th PPPAC
|
Final approval |
14 |
Development of 8- Lane Elevated Flyover at Tier 1 on Single Pier including upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed section of NH-60 in the state of Maharashtra under NH(O) Projects on Build, Operate and Transfer (BOT) Mode. |
Ministry of Road Transport and Highways (MoRTH) |
Maharashtra |
Transport and Logistics |
Roads |
7,807.76 |
02.03.2024
|
115th PPPAC
|
Final approval |
15 |
Development of 4-lane access-controlled Pathalgaon-Kunkuri-CG/JH border-Gumla-Bharda section as part of Raipur-Dhanbad Economic Corridor under Bharatmala Pariyojana in the state of Chhattisgarh and Jharkhand on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
Jharkhand |
Transport and Logistics |
Roads |
4,472.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
16 |
Development of 4 lane access-controlled Economic Corridor from Kharagpur to Moregram Section Km 0.000 to Km 230.957 of NH 116A divided into 5 packages in the state of West Bengal under Bharatmala Pariyojana on HAM model |
Ministry of Road Transport and Highways (MoRTH) |
West Bengal |
Transport and Logistics |
Roads |
1,024.70 |
21.02.2024
|
114th PPPAC
|
Final approval |
17 |
Development of 6 lane access-controlled Agra-Gwalior greenfield highway in the state of Uttar Pradesh, Rajasthan and Madhya Pradesh on BOT(Toll) Mode |
Ministry of Road Transport and Highways (MoRTH) |
Uttar Pradesh |
Transport and Logistics |
Roads |
4,262.78 |
21.02.2024
|
114th PPPAC
|
Final approval |
18 |
Construction of Guwahati Ring Road in the state of Assam on DBFOT (Toll) |
Ministry of Road Transport and Highways (MoRTH) |
Assam |
Transport and Logistics |
Roads |
5,729.47 |
20.02.2024
|
113th PPPAC
|
Final approval |