logo
pppinindia.gov.in

public private partnership in india

Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)

Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)

This Report provides information on all infrastructure projects in the database across pre-defined set of parameters and following coverage criteria:
Export to Excel

Filters

Sr No. Project Name Sponsoring Authority Location Sector Sub Sector Total Project Cost (In Rs. Crore) PPPAC Meeting Date Meeting Number Recommended For
1 Selection of a Private Partner to develop Infrastructure at the Indian Institute of Management (IIM) - Udaipur on PPP Mode. Department of Higher Education Rajasthan Education Infrastructure design and development 100.43 19.10.2024 116th PPPAC Final approval
2 Selection of a Private Partner to develop Student Hostels at the Indian Institute of Technology (IIT) - Madras on PPP Mode. Department of Higher Education Rajasthan Education Infrastructure design and development 396.96 19.10.2024 116th PPPAC Final approval
3 Construction, Development, Financing Operation and Maintenance of Students Hostel in campus of Indian Institute of Information Technology (IIIT) - Nagpur on DBFOT under PPP Mode. Department of Higher Education Rajasthan Education Infrastructure design and development 52.52 19.10.2024 116th PPPAC Final approval
4 Greenfield Development, Maintenance and Management of a new alignment of National Highway-06 from Mawlyngkhung in Meghalaya (from 61.8 km on existing NH06) to Panchgram in Assam (to 197.4 km on the existing NH06) by 4 laning with paved shoulders. Ministry of Road Transport and Highways (MoRTH) Meghalaya Transport and Logistics Roads 24,804.82 09.11.2024 117th PPPAC Final approval
5 Six-Lane Greenfield Highway from Pagote to Chowk of NH 348B in Maharashtra on Built Operate Transfer (BOT) mode. Ministry of Road Transport and Highways (MoRTH) Maharashtra Transport and Logistics Roads 3,653.09 03.12.2024 118th PPPAC Final approval
6 Four-Lane Patna – Arrah - Sasaram Access Controlled Greenfield Corridor’ as a new National Highway NH-119A on Hybrid Annuity Model (HAM) Ministry of Road Transport and Highways (MoRTH) Bihar Transport and Logistics Roads 0.00 03.12.2024 118th PPPAC Final approval
7 Ropeway Project between Sonprayag and Kedarnath on Design, Build, Finance, Operate and Transfer (DBFOT) model Ministry of Road Transport and Highways (MoRTH) Uttarakhand Transport and Logistics Roads 0.00 03.12.2024 118th PPPAC Final approval
8 Ropeway project between Govindghat and Hemkund Sahib in the State of Uttarakhand on DBFOT model. Ministry of Road Transport and Highways (MoRTH) Uttarakhand Transport and Logistics Roads 2,589.04 01.01.2025 119th PPPAC Final approval
9 Six-lane Zirakpur Bypass in the state of Punjab & Haryana on Hybrid Annuity Mode Ministry of Road Transport and Highways (MoRTH) Punjab Transport and Logistics Roads 1,878.31 01.01.2025 119th PPPAC Final approval
10 Four-lane STRR, NH948A - Obalapura to S.Mudugadapalli in Karnataka & Tamil Nadu on HAM. Ministry of Road Transport and Highways (MoRTH) Karnataka Transport and Logistics Roads 8,834.08 01.01.2025 119th PPPAC Final approval
11 Four-lane, Badvel to Nellore section of NH-67 in the state of Andhra Pradesh on HAM Ministry of Road Transport and Highways (MoRTH) Andhra Pradesh Transport and Logistics Roads 4,377.38 04.02.2025 120th PPPAC Final approval
12 Two-lane with Paved shoulder from Basnaghat (Morigaon) to Bhuragaon (in Darrang district) including new 2 lane Major Bridge over river Brahmaputra in the State of Assam on HAM Ministry of Road Transport and Highways (MoRTH) Assam Transport and Logistics Roads 0.00 04.02.2025 120th PPPAC Final approval
13 Six-lane Access Control Greenfield Capital Region Ring Road (Bhubaneswar Bypass) from Rameshwar to Tangi in the State of Odisha on HAM Ministry of Road Transport and Highways (MoRTH) Odisha Transport and Logistics Roads 0.00 04.02.2025 120th PPPAC Final approval
14 Four-lane, Parmakudi to Ramanathapuram Section of NH-87 in the state of Tamil Nadu on HAM Ministry of Road Transport and Highways (MoRTH) Tamil Nadu Transport and Logistics Roads 32.09 04.02.2025 120th PPPAC Final approval
15 Considering the revalidation of the revised cost of the Development, Maintenance and Management of the New NH-06 from Existing 61.8KM, Mawlyngkhung (Barapani Near Shillong in Meghalaya) to existing Km.197.40 New NH-06 (Panchgram in Assam) in the State of Meghalaya and Assam by 4-Laning with paved Shoulder on Hybrid Annuity Mode (HAM) Basis under Public-Private Partnership (PPP) Mode reg: - Ministry of Road Transport and Highways (MoRTH) Meghalaya Transport and Logistics Roads 22,863.93 21.02.2025 121st PPPAC Final approval